Paint Booth and Bake Oven Booths. The 2 inline down draft booths are complete with roller door entry and exit, air supp ... 请看下面

销售: GM Holden Vehicle Manufacturing & Assembly Facility

该货品投标已结束

类型: 协商交易
地点: Elizabeth, AU
开始时间: 18 August 2016 02:00 AM ET
结束时间: 20 October 2017 02:00 AM ET
剩余时间: Days, Hours, Minutes
Paint Booth and Bake Oven Booths. The 2 inline down draft booths are complete with roller door entry and exit, air supply house, extraction plennum/ fans /ducting, lighting, and filtration. Booth is supplied with overhead and side fluorescent lighting, compressed air and breathable air piping/ filtration - Note: Buyer will need to plumb into their own compressor to supply air for spraying/ breathing. Booth is supplied with infrared heat lamps on 2 axis track system (both tunnel surround and spot repair on moveable arm, and removable floor grating that enables spray fumes to be extracted down into exhaust plennum/ tunnel - Extraction filters are at ground level. The 2 inline booths can be separated with an internal roller door that enables spraying in one and curing in the next with a rack and pinion moveable Infrard heat lamp surround. . A gas fired Air House supplies humidified and temperature controlled air to each booth - Modulating motor is used to control gas to burner and cell-deck pads are fed water from the humidification tank. Filtration is present in the form of pocket filters within each air house and ceiling filter media at booth level for balanced air diffusion - Note Filters have been removed from booth ceiling. Filter saturation is measurable via Magnahelic gauges that are present at the entry to the booth. Waste water treatment consists of a scrubber that extends down into the concrete Pit that it is housed.. As these 2 booths are joined to a common mix room the Mix Room is not included in the sale. Extraction ducting that penetrates the building finishes at the underside of the jacking frame that penetrates the roof unless agreed otherwise by the relevant Holden Project Engineer in charge of this asset. The buyer will be responsible for removal of this asset in accordance with standard Holden site conditions. Any pipe work or other services that are part of the building network or that are contained within the concrete slab flooring are not part of this asset sale. As the overhead platform, walkways and stairs service more than 1 asset it is likely that some/ a number of components will not be included with this asset - Note: This will be determined by the Holden Project Engineer for this asset. Please refer to the attached document for additional information. Winning bidders are subjected to the terms and conditions of the sale and will be required to sign an asset sale agreement. Assets will be made available for removal early in 2018. Collections require a removal plan and a scheduled collection time.Winning bidders are subjected to the terms and conditions of the sale and will be required to sign an asset sale contract all documents can be found on the main event page. Assets will be made available for removal once GM Holden ends production at the end of October, 2017. Winning bidders are required to submit a removal plan for GMH review and approval please reference the GM Holden Asset Removal document and Site Contractors Reference Booklet for more information, both documents can be found on the main event page. Only SAFcomm approved/accredited contractors can undertake equipment removal works. The buyer is responsible for all rigging and transportation costs. For inquiries on registration, how to bid, how to pay, or how to navigate the website, please view Terms and Conditions, contact our customer service department at help@go-dove.com or +61 (3) 85 18 43 54.**
DTID 单位 设备状况 说明
1 GMH-ADEL-EL-04110-30 1 EA 使用过 PAINT BOOTH AND BAKE
Click here to view Product-Information
Via Appointment
  • 付款方式:可接受的付款方式包括PayPal,Visa,万事达卡,美国运通卡,银行本票,汇票,电汇和公司支票(附银行的担保函)。请注意,我们不接受现金,ACH存款,个人支票或预付借记卡。
  • 如果您不选择信用卡支付,必须提交以下信息和一份信用指示函:
    • 公司名称 ( 如适用)
    • 客户名称
    • 电话号码
    • 销售活动号或合同号
    • 签名和日期
  • 用户帐户的名称和地址必须与投标和购买时使用的信用卡上的姓名和帐单地址相匹配,否则所收取的费用将被拒绝
  • 所有付款资金必须来自于在网站注册者。我们不接受任何形式的第三方付款,无论出于何种原因。
  • 你必须在正式发票出具后的3个工作日内付清全部款项,除非另有说明。出于计算付款期限的目的,出具发票的当日不计算在内。发票将每个事件产生的数量,而不是每个批号。
  • 除非在我们的网站上另有说明,或者您在销售结束之前与我们联系,否则我们会在销售结束后的第二个工作日从您所提交的信用卡上收取购买价格的全部金额(包括买家佣金和税)。
  • 对于超过$10,000美金或等值的发票,我们将不会接受信用卡付款;客户必须通过保付形式(即电汇,本票)支付款项。
  • 货物的位置: 180 Philip Hwy, Elizabeth, 5112 AU
  • 设施部门经理: Customer Service
  • 设施部门电子邮件: Jeff.Morter@liquidityservices.com
  • 国家: AU
  • 电话: +61 (0) 475 555 885

180 Philip Hwy, Elizabeth, 5112 AU

更多信息
  • 本货品需付一个 16% 的买家佣金
  • 本地税表